CN Railway Bridge, Sainte-Anne-de-Bellevue
Montreal (QC)
Ste-Anne-de-Bellevue (QC)
Project Description
- Complete replacement of the structure of the main span of a railway bridge in Ste-Anne de Bellevue.
- A 102 years old riveted truss CN bridge had to be replaced by two new spans.
- Replacement of the bridge deck was carried out by means of mobile hydraulic barges and platforms.
- The replacement of the spans had to be executed within 30 hours.
Description of services provided
- Pre-project studies;
- Engineering for the replacement procedure of the spans for the stability on temporary towers as well as the demolition of the old span;
- Construction Engineering for the preparation of the replacement span.