CN Railway Bridge, Sainte-Anne-de-Bellevue

Montreal (QC)
Ste-Anne-de-Bellevue (QC)

Project Description

  • Complete replacement of the structure of the main span of a railway bridge in Ste-Anne de Bellevue.
  • A 102 years old riveted truss CN bridge had to be replaced by two new spans.
  • Replacement of the bridge deck was carried out by means of mobile hydraulic barges and platforms.
  • The replacement of the spans had to be executed within 30 hours.

Description of services provided

  • Pre-project studies;
  • Engineering for the replacement procedure of the spans for the stability on temporary towers as well as the demolition of the old span;
  • Construction Engineering for the preparation of the replacement span.

Complementary expertise dedicated to the success of your projects.

Privacy Overview
LOGO

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.