
Construction of the Marcel-de-la-Sablonnière pumping station
Terrebonne (QC)
PROJECT DESCRIPTION
Construction of a wastewater pumping station including a 9 meter high steel frame building.
DESCRIPTION OF THE SERVICES PROVIDED
- Assistance with preliminary design;
- Drawing structural plans;
- Partial field supervision including review of shop drawings.


