Énergir – Louis-Bisson Bridge Gas Line Supports

Laval (QC)
Montreal (QC)

Project Description

As part of the project to replace the existing bridge deck by the MTQ, Gaz Metro ordered a study to replace the supports of the suspended gas pipeline to the existing bridge deck. Instead of being suspended to the concrete deck, new supports are to be attached to the steel beams of the bridge. Our design also included the implementation of a fall protection system.

Description of services provided

  • Inspection of existing pipe supports;
  • Preparation of plans and specifications for the modification of the supports.

Complementary expertise dedicated to the success of your projects.

Privacy Overview
LOGO

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.