
Alterations to Control Towers at Three Airports
Nigeria, Trinidad, Luxor
Project Description
- Pre-project study
- Design plans and specifications for construction
Fabrication and Construction Engineering
- Design of all details, coordination and verification of shop drawings.
Project Description : NIGERIA
- Transition structure for the addition of a cabin on the existing control tower adapting the square shape of the tower to the octagonal shape of the cabin.
Project Description : TRINIDAD
- Construction of a new 36 meters high air traffic control tower in reinforced concrete.
Project Description : LUXOR
- Modifications to the existing control tower of Luxor in Egypt, including the dismantling of the existing cabin, the addition of a floor and the construction of a new control cabin.







