
Temporary building for the Muskrat Falls project
Muskrat Falls (NL)
PROJECT DESCRIPTION
Construction of the temporary building required to allow year-round construction work at the Muskrat Falls hydroelectric generating station on the lower Churchill River in Labrador. This building is 45 meters high and has an area of 11,000 m².
DESCRIPTION OF THE SERVICES PROVIDED
- Assistance with preliminary design;
- Structural modeling necessary to carry out seismic and wind analyzes;
- Drawing structural plans;
- Partial field supervision including review of shop drawings.




