
Whitehall Ferry Terminal
New-York (USA)
Project Description
- Built in phases, rehabilitation and expansion of the Whitehall Ferry Terminal in Battery Park/New York City required more than 3,500 tons of structural steel.
Description of services provided
- Fabrication Engineering: Concept and design of all connections for the project.
- Construction Engineering: Development of the erection procedure, methods of assembly and transportation of the structural steel assemblies.




